⎝⎛欢乐拼三张⎞⎠

Hello, welcome to visit the official website of Shenzhen Toyo Refrigeration Equipment Co., Ltd.!

Industrial Refrigeration · National High-tech · Listed Companies

26 years of industry cultivation, just for your ingenuity

National Service Hotline:

0755-84877928

Recommended Products

  • Toyo 5p condenser cooler | Toyo TYS-05 column tube / shell tube cooler | Single circuit

    Toyo 5p condenser cooler | Toyo TYS-05 ...

  • Toyo condenser Guangdong brand condenser Toyo TYS-15 shell and tube tube condenser

    Toyo condenser Guangdong brand condenser Dong ...

  • Shenzhen Toyo TY-02A acid and alkali resistant air-cooled chiller

    Shenzhen Toyo TY-02A acid and alkali resistant air-cooled ...

  • Air-cooled chiller / Toyo TY-12A air-cooled chiller / industrial air-cooled chiller / small chiller manufacturer

    Air-cooled chiller / Toyo TY-12A air-cooled ...

  • Condenser | Toyo TYS-10 Shell and Tube Condenser | Dual Circuit | Specially for Chiller

    Condenser | Toyo TYS-10 Shell and Tube Condenser | ...

  • Electroplating chiller / Shenzhen Toyo TY-02A air-cooled chiller / Shenzhen 2p air-cooled chiller

    Electroplating chiller / Shenzhen Toyo TY-02A air cooling ...

  • Condenser | Toyo TYS-12 Shell and Tube Condenser | Dual Circuit |

    Condenser | Toyo TYS-12 Shell and Tube Condenser | ...

  • Toyo TY-12A acid and alkali resistant air-cooled chiller

    Toyo TY-12A acid and alkali resistant air-cooled chiller

  • Chemical chiller / Toyo TY-15A box type air-cooled chiller / Longxi chiller supply / plating chiller

    Chemical chiller / Toyo TY-15A box ...

  • Toyo chiller / Toyo chiller manufacturer / Toyo 20p chiller / Shenzhen air-cooled chiller manufacturer

    Toyo chiller / Toyo chiller manufacturer / Toyo ...

Contact us

Shenzhen Toyo Refrigeration Equipment Co., Ltd.

Phone13510242241 075584877928

Fax 0755-84878528

Address No.8 Building, Longxi Third Industrial Zone, Longcheng Street Office, Longgang District, Shenzhen

Cooling Round Tower⎝⎛欢乐拼三张⎞⎠ >> Products >> Cooling Tower >> Cooling Round Tower

深圳市东洋冷冻设备有限公司-东洋 冷却水塔(10T-200T)
  • Shenzhen Toyo Refrigeration Equipment Co., Ltd.-Toyo Cooling Water Tower (10T-200T)
  • Shenzhen Toyo Refrigeration Equipment Co., Ltd.-Toyo Cooling Water Tower (10T-200T)
  • Shenzhen Toyo Refrigeration Equipment Co., Ltd.-Toyo Cooling Water Tower (10T-200T)

Cooling tower

Toyo cooling water tower (10T-200T)

Type: Water Tower

Brand: Toyo
Weight: 240-1050 (kg)
Construction type: sealed / round

Toyo cooling water tower (10T-200T) product details

品牌:东洋 Type: Water Tower Brand: Toyo
Weight: 240-1050 (kg)
Construction type: sealed / round

用领域: Application areas:

Cooling towers are mainly used in air-conditioning cooling systems, refrigeration series, injection molding, tanning, foaming, power generation, steam turbines, aluminum profile processing, air compressors, industrial water cooling and other fields. The most widely used are air-conditioning cooling, refrigeration, plastic chemical industry . The specific division is as follows:

1. Air room temperature regulation: air-conditioning equipment, cold storage, refrigerated rooms, etc .;
、制造业及加工类:食品业、药业、金属铸造、塑胶业、橡胶业、纺织业、钢铁厂、化学品业、石化制品类等; 2. Manufacturing and processing: food industry, pharmaceutical industry, metal casting, plastic industry, rubber industry, textile industry, iron and steel plant, chemical industry, petrochemical products, etc.


、机械运转降温类:发电机、汽轮机、空压机、油压机、引擎等; 3. Mechanical operation cooling category: generator, steam turbine, air compressor, oil compressor, engine, etc.

The role of the cooling tower is to exchange the cooling water carrying waste heat with the air inside the tower body, so that the waste heat is transmitted to the air and dispersed into the atmosphere.

Cooling tower structure diagram:


Specifications:
unit
60T
80T
100T
125T
150T
175T
200T
225T
flow
m3 / h
46.8
62.64
78.12
97.56
177.0
136.8
156.24
175.5
Air volume
m3 / h
25200
27000
42000
49800
57000
69000
75000
90000
Motor
Kw
1.5
1.5
2.25
2.25
4.0
4.0
4.0
5.5
net weight
Kg
240
260
500
540
580
860
880
1050
Heavy operation
Kg
1250
1280
1600
1640
1680
1960
1980
2770
Tower height
TH
2395
2555
2735
3000
3000
3500
3500
4170
Shell
CH
1460
1460
1565
1830
1830
1935
1935
2060
Air inlet
AH
325
325
325
325
325
365
365
560
basin
WH
500
500
525
525
525
810
810
900
Out / in water
OH / IH
165/260
165/260
180/325
180/325
180/325
250
250
280
Fan diameter
ED
1180
1180
1470
1470
1470
1780
1780
2135
Basin diameter
WD
2110
2100
2920
2920
2920
3320
3320
4200
Outlet / Inlet hose
WO / WI
100/100
100/100
125/125
125/125
150/150
150/150
150/150
200/200
Full water / drain
OF / DR
25/25
25/25
25/25
25/25
25/25
40/40
40/40
50/50
Floating wave
FV / QS
20/20
20/20
25/25
25/25
25/25
25/25
25/25
25/25
Base height
FH
300
300
300
300
300
300
300
300
Base width
FS
300
300
300
300
300
300
300
300
Water tank foundation
FC
-
-
600
600
600
800
800
800
Center diameter
FD
1670
1670
2360
2360
2360
3530
3530
4330
Screw specifications
BC
M12
M12
M12
M12
M12
M14
M14
M14

Cooling tower design:
1. Atmospheric pressure: -P = 99400Pa;
2. Wet bulb temperature: -WBT = 28 ℃;
3. Water inlet temperature: -T1 = 37 ℃;
4. Water temperature: -T2 = 32 ℃;
5. Water temperature drop: △ TS = 5 ℃;
6. If the customer needs other cooling towers with temperature drop, please contact the company directly for consultation.
7. The product is continuously improved and innovated, and the specifications are subject to change without notice;
Honor:
Top 10 chiller industry in Shenzhen
Shenzhen Gold Medal Manufacturer
Longgang Outstanding Enterprise
China Top 500 Refrigeration
Dongguan Customer Satisfaction Enterprise
Advanced Unit for Implementing Customer Satisfaction Project in Dongguan
our service:
Free Shipping: Our company has full-time driver delivery
Free installation: Our company strictly follows the relevant national construction and acceptance specifications for engineering installation. After the project is completed, the system is debugged. If the performance indicators are qualified, the two parties sign and accept the inspection and deliver it to the party.
Free design: design according to customer needs.
Maintenance: After the expiration of the free maintenance period, our company implements a lifetime discount service and only charges the maintenance cost.

Delivery on time: Confirm the customer's order and ship it as soon as possible. The Pearl River Delta region is just one day away. 3 ~ 5 days in remote areas

our service

、产品包装 1. Product packaging

/粉碎机、混色机、搅拌机等注塑机辅机生产厂家,机器从厂家出厂进行薄膜和纸箱进行相应包装,防止进水或是摩擦,同时根据客户要求进行木箱包装,防止货物在中途的破损。 The company is a professional manufacturer of injection machine auxiliary machines such as chiller / ice chiller / freezer, screw feeder, crusher / pulverizer, color mixer, mixer, etc. Packing to prevent water or friction, at the same time according to customer requirements in wooden cases to prevent damage to the goods in the middle.

、产品运输 2. Product transportation

The company is a member customer of Debang, Xinbang and other large logistics companies, and can enjoy the advantage of priority delivery. At the same time, it can be reached within 1-2 days in cities around Guangdong and the Pearl River Delta, and within 3-5 days in remote cities. A number of services such as door-to-door or door-to-door pickup; at the same time, small corresponding accessories have been cooperated with large express companies such as Shunfeng, Shentong, Suer, etc., and the surrounding cities will arrive in about one day. , Flash floods, mudslides and other special natural disasters).

、产品售后 3. Product after sales

On-site commissioning of large equipment: Our company commissions and installs new large units purchased by customers. Customers should notify our service department in writing 3 days before commissioning so that our company can arrange commissioning personnel to arrive at the site within the time required by customers. Commissioning; free warranty for 12 months, free technical support.

Lifetime maintenance service: During the warranty period, if the machine has abnormal conditions, our company will carry out free inspection and maintenance, but it does not include user's artificial damage. It will continue to track the implementation of lifelong maintenance service outside the warranty period. If replacement parts are required, only the cost of the parts will be charged. fee.

Timely, thoughtful and perfect service: In order to relieve the worries of users, our company is equipped with a strong after-sales service team, and has a number of specialized after-sales service personnel in various regions of the country. We have sufficient spare parts in stock, and we promise to ensure that after receiving the customer's request for maintenance service and confirmation, the maintenance staff will send professional maintenance staff to the scene to resolve it as soon as possible.




Previous Product: Toyo Open Cooling Tower (8T-50T)

Next product: None

欢乐拼三张 七乐彩 必赢真人娱乐 星力捕鱼